
Overview
What's Included
Complete solar energy solutions for homes of all sizes. From a basic backup system to a full off-grid setup, we design systems tailored to your household's exact requirements.
Process Workflow
How It Works
01
Site assessment and load analysis
02
Custom system design and proposal
03
Equipment procurement and quality check
04
Professional installation (2–3 days)
05
Commissioning and homeowner training
FAQ
Common Questions
How long does a Residential Solar installation take?+
Typical residential installations take 2–3 days. Larger commercial projects may take 1–2 weeks depending on system complexity and site conditions.
Do I need planning permission?+
In most cases, residential solar in Nigeria does not require planning permission. Commercial installations may need approval from local electrical and building authorities. GoSolar handles all necessary structural assessments.
What warranty do I get?+
Solar panels carry a 25-year linear power output warranty. Inverters are covered for 5 years. Lithium batteries carry a 10-year warranty. GoSolar provides a 12-month workmanship warranty on all installations.
Will the system work during a power outage?+
Hybrid and off-grid setups with lithium battery storage will automatically and seamlessly power your connected loads during utility grid outages. Grid-tied setups without storage automatically disconnect for safety reasons.
Key Benefits
- ✓Eliminate generator fuel costs
- ✓24-hour power independence
- ✓Protect sensitive home electronics
- ✓Reduce electricity bills by 60–90%
- ✓25-year panel warranty
Ready to get started?
Get a free site assessment and custom system proposal from our electrical engineering team.
Start Your Solar Journey Today
Our certified electrical engineers are ready to assess your requirements and design the perfect system.