
Overview
What's Included
Hybrid systems intelligently combine solar generation, battery storage, and grid or generator input. Prioritise solar, store surplus energy, and draw from backup sources only when needed.
Process Workflow
How It Works
01
Load profile analysis
02
Hybrid inverter and battery selection
03
Solar array sizing
04
Professional installation
05
System commissioning and optimisation
FAQ
Common Questions
How long does a Hybrid Solar Systems installation take?+
Typical residential installations take 2–3 days. Larger commercial projects may take 1–2 weeks depending on system complexity and site conditions.
Do I need planning permission?+
In most cases, residential solar in Nigeria does not require planning permission. Commercial installations may need approval from local electrical and building authorities. GoSolar handles all necessary structural assessments.
What warranty do I get?+
Solar panels carry a 25-year linear power output warranty. Inverters are covered for 5 years. Lithium batteries carry a 10-year warranty. GoSolar provides a 12-month workmanship warranty on all installations.
Will the system work during a power outage?+
Hybrid and off-grid setups with lithium battery storage will automatically and seamlessly power your connected loads during utility grid outages. Grid-tied setups without storage automatically disconnect for safety reasons.
Key Benefits
- ✓Automatic power source switching
- ✓Maximise solar self-consumption
- ✓Generator auto-start integration
- ✓Remote monitoring and control
- ✓Expandable battery capacity
Ready to get started?
Get a free site assessment and custom system proposal from our electrical engineering team.
Start Your Solar Journey Today
Our certified electrical engineers are ready to assess your requirements and design the perfect system.